Method for installation and debugging of screw feeding hoist

Stainless steel screw hoist is installed correctly

(1) Before installation, check whether the conveyor is in good condition, whether the parts have defects, whether there is bump deformation in the transportation process.

(2) Measure the size of the reserved hole at the installation site to see if it is consistent with the size of the installation hole of the conveyor support plate. If it is consistent, it should be fixed firmly with bolts or expansion screws.

(3) When connecting each machine slot, the bolts of each section should be worn well first, and the bolts should be straightened and connected according to the line to ensure that a line is formed after the connection.

(4) Conveyor feeding mouth, discharging mouth can be flexibly set up according to the needs of the site, can be set up one, can also be set up more (round, square), in and out of the material mouth broken welding sealant.

(5) Motor center height and conveyor center height to keep consistent, two coupling side by side close, fixed with fastening screws.